Install
Schedule
install
Install window
84x SG 11 MW from late Mar 2026 (Wind Scylla)
COD / first power
First power end-2026; full COD 2H 2027
Open vessel demand
What is still unnamed on this farm.

Jones Act support/CTV/guard while Scylla splits time with Revolution Wind

Who to call: Ørsted US Northeast marine / Cadeler
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
not disclosed
Turbine T&I
Cadeler (Wind Scylla)
Array cable
not disclosed
Export cable
Jan De Nul (Connector; Adhémar de Saint-Venant trench)
O&M / SOV contractor
not disclosed
Fixtures & open campaigns on this farm
1 lines from the wind fixture book.
DateHullClassStatus
2026-03-25Wind Scylla
Cadeler
WTIV / installationIn-house
watch — shared with Revolution Wind
Source: OffshoreWIND.biz 31 Mar 2026 and 17 Apr 2026offshorewind.bizLogged 2026-08-14