SSY Offshore Wind Portal
Wind farms
US Rhode Island / Connecticut

Revolution Wind

Ørsted / Skyborn Renewables

Install
Schedule
install
Install window
4 of 65 WTG remaining as of 13 Aug 2026 (Wind Scylla back on site)
COD / first power
First power Mar 2026; full COD end-2026
Open vessel demand
What is still unnamed on this farm.

Last four WTG + commissioning CTV/SOV this month–Q4

Who to call: Ørsted / Skyborn / Cadeler
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
not disclosed
Turbine T&I
Cadeler (Wind Scylla)
Array cable
not disclosed
Export cable
not disclosed
O&M / SOV contractor
not disclosed
Named vessels
1 hulls stamped on this farm.
Fixtures & open campaigns on this farm
1 lines from the wind fixture book.
DateHullClassStatus
2026-08Wind Scylla
Cadeler
WTIV / installationIn-house
covered
Source: CT Mirror 13 Aug 2026; Ørsted Q results; revolution-wind.comctmirror.orgLogged 2026-08-14