OranjeWind (Hollandse Kust West VII)

RWE / TotalEnergies

Install
Schedule
install
Install window
Scour from Mar 2026; foundations later 2026–2027; WTG 2027 (53x V236-15 MW)
COD / first power
First power ~Apr 2027; full COD early 2028
Open vessel demand
What is still unnamed on this farm.

Voltaire also on Dogger Bank B to Q2 2027 — 2027 WTG slot tightness; construction CSOV before Purus O&M

Who to call: OranjeWind / RWE / Jan De Nul / DEME / Purus
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
Jan De Nul
Turbine T&I
Jan De Nul
Array cable
DEME (114 km IAC + secondary steel)
Export cable
TenneT grid
O&M / SOV contractor
Purus (Purus Power 5-year O&M CSOV from 2026 award)
Fixtures & open campaigns on this farm
3 lines from the wind fixture book.
DateHullClassStatus
2027Voltaire
Jan De Nul
WTIV / installationIn-house
watch — DBB overlap
2026-06-08Purus Power
Purus
CSOVCovered
covered
2026-03Simon Stevin
Jan De Nul
Barge / feeder / tugIn-house
covered
Source: OffshoreWIND.biz 30 Mar 2026; oranjewind.nl; OffshoreWIND.biz 8 Jun 2026 Purusoffshorewind.bizLogged 2026-08-14